Setting-out records: what to document before works begin.

Stop reconstructing checks from scattered drawings and notes. Dictate what you observed and prepare a draft to verify against the project.

Get your site record templateTemplate coming soon

Request the template for setting-out record

Choose a document and leave your email to register your interest. No account or app purchase required.

Template coming soon

There are no files to download yet. You can save your request today; this form does not email documents.

A template request, not an official certificate. Adapt and review it before using it on your project.

Setting-out record

How we use your email

We use your email and selected document to handle this request. Only if you select the marketing option may we also send you DocuSite tips and offers. We save the date and wording of your permissions. Request access, correction, deletion or withdraw consent at [email protected]. Marketing consent is not required to request a template.

We keep the request while needed to handle it; you can ask for deletion. Send privacy enquiries to [email protected]. You can lodge a complaint with Spain's AEPD.

Ask about or withdraw consent

What is a setting-out record?

It records checks made when transferring the project onto the site: reference points, axes, levels and conditions affecting the start. It identifies what was checked, which drawings were used and which differences remain unresolved. It is not simply a statement of intent or automatic permission to build.

When to use this document

  • When checking the setting out against the project drawings.
  • When differences in levels, alignments or site conditions arise.
  • Before recording the agreed conditions for starting the works.

What to include in a setting-out record

  • Project and site identification, with the current drawing revision.
  • Check date and participants with their roles.
  • Axes, alignments, levels and reference points actually checked.
  • Observed site availability and conditions within the scope of the check.
  • Specific discrepancies, reservations or obstacles, with supporting photos or sketches.
  • Decisions by competent parties, outstanding points and appropriate signatures.

How to prepare the setting-out record

  1. 1

    Identify the current drawings

    Record the reference and revision. An outdated drawing makes the scope of the check unclear.

  2. 2

    Record each check

    Describe the point measured and its project reference. Separate verified data from items still awaiting confirmation.

  3. 3

    Explain discrepancies

    Locate each issue and its possible effect on the start. Do not turn an unresolved difference into blanket approval.

  4. 4

    Review decisions and signatories

    Check conclusions with the competent team and the applicable procedure. The draft cannot authorise the start on its own.

Common mistakes

  • Assuming all contracts use the same setting-out procedure.
  • Copying a compliance statement while omitting reservations.
  • Leaving out the drawing revision or the precise location of a discrepancy.

Content example

Setting-out record

Check

Axes A–C are reviewed against setting-out drawing R-02 provided by the team.

Issue

A difference is observed in the entrance reference level. Pending verification by the supervising professional.

Decision

The supervisor will confirm the level before the entrance works proceed.

Fictional, shortened example. Not a valid document for signature or certification.

What to check in Spain

For building works covered by Spain's LOE, articles 11–13 assign signing duties for the setting-out or start record to the agents identified there. Public works contracts have a specific checking procedure under article 237 of the LCSP. Do not automatically apply public procurement rules to a private project.

Practical guidance from DocuSite. Not an official form or a substitute for review by the responsible professional or the requirements applicable to your project.

Before you decide

Questions about this document

Your 3 free documents are activated after you verify both your phone number and email in the app.

What is a setting-out record?
It records checks of the site setting out against the project and the circumstances or decisions arising from those checks. Content, effects and signatories depend on the contract and applicable requirements.
Does the draft automatically authorise work to start?
No. DocuSite drafts from the information provided. Authorising or setting conditions for work is a decision for the competent parties under the applicable procedure, not for AI.
Can I record differences from the drawing?
Yes. Include the drawing reference, check performed and observed difference. Make sure the draft does not present an observation awaiting verification as an approved decision.
Is there one official template for every project in Spain?
No universal template is provided here. Check the contracting authority's procedure for public works and the requirements of the relevant contract. The DocuSite download template is not available yet.

Other records for your project

From a template to a voice-based draft

A template gives you structure. In DocuSite, start with your photos and what you say on site. Check the estimated time value and the workflow before deciding.

Your first 3 documents, free

Open the app. Create your project. Start with photos.

Your company, your whole team and five document types. Start with 3 free after verifying your phone and email.

Your 3 free documents are activated after you verify both your phone number and email in the app.

Preview: registration and download links are not connected yet.

Have a question? Contact us