Snagging records: a checklist that shows what is really outstanding.

A mark on a photo doesn't say who should fix it. Keep every snag located, described and ready to check with the team.

Get your site record templateTemplate coming soon

Request the template for snagging record with checklist

Choose a document and leave your email to register your interest. No account or app purchase required.

Template coming soon

There are no files to download yet. You can save your request today; this form does not email documents.

A template request, not an official certificate. Adapt and review it before using it on your project.

Snagging record with checklist

How we use your email

We use your email and selected document to handle this request. Only if you select the marketing option may we also send you DocuSite tips and offers. We save the date and wording of your permissions. Request access, correction, deletion or withdraw consent at [email protected]. Marketing consent is not required to request a template.

We keep the request while needed to handle it; you can ask for deletion. Send privacy enquiries to [email protected]. You can lodge a complaint with Spain's AEPD.

Ask about or withdraw consent

What is a snagging record or punch list?

It records issues and unfinished items, often before handover. The point is not to collect marks on photos but to make every item locatable, assignable and verifiable through to closure. In Spain, it is commonly called a lista or acta de repasos.

When to use this document

  • During pre-handover checks of homes, premises or common areas.
  • When assigning corrective work to the responsible teams.
  • On follow-up visits to verify items reported as fixed.

What to include in a snagging checklist

  • Project, unit or zone, review date and participants.
  • A unique identifier retained across visits.
  • Room and precise location of the affected element.
  • Observable issue description and reference photograph.
  • Agreed owner and deadline, with unconfirmed details made explicit.
  • Status, verification date and closure evidence where checked.

How to organise snags before handover

  1. 1

    Follow a consistent route

    Group by unit, floor or room. Repeat the same route during the verification visit.

  2. 2

    Use one entry per issue

    Do not combine a rubbing window and a paint defect in one task. Each needs an actionable description.

  3. 3

    Agree an owner and deadline

    Record what the team agreed. A default name does not establish that someone accepted the task.

  4. 4

    Separate reported fixes from verified fixes

    Record the completion notice, but close the item after the appropriate check. Link new evidence to the original issue.

Common mistakes

  • Maintaining several unconnected lists and losing the current version.
  • Closing an item solely because someone reported it finished.
  • Treating a snag list as an automatic replacement for formal handover.

Content example

Snagging record with checklist

S-012 · Bedroom 2

Check the window leaf closure. Rubbing is observed when operating the handle.

Agreed owner

Joinery team. Deadline to be confirmed.

Status

Awaiting work and subsequent verification on site.

Fictional, shortened example. Not a valid document for signature or certification.

What to check in Spain

For building works covered by Spain's LOE, article 6 regulates reception and reservations. A snag list can describe defects but does not automatically replace the reception record or the record confirming reservations have been remedied. Verify the documents and signatures needed for your handover.

Practical guidance from DocuSite. Not an official form or a substitute for review by the responsible professional or the requirements applicable to your project.

Before you decide

Questions about this document

Your 3 free documents are activated after you verify both your phone number and email in the app.

What is a snagging record?
A record of points needing correction or verification, often before handover. A checklist by zone helps locate each point and follow its resolution.
Can I mark an item as resolved?
The status should reflect what the responsible person verified. A team reporting completion doesn't necessarily mean the fix has been inspected.
Does it replace a formal handover record?
Not necessarily. A snag list documents open items, but handover documents and their effects depend on the contract and applicable framework. Check before using it as a substitute.
How do I avoid losing items between visits?
Keep each item's identifier and update status, evidence and review date. Create a new entry for a different issue instead of overwriting the previous history.

Other records for your project

From a template to a voice-based draft

A template gives you structure. In DocuSite, start with your photos and what you say on site. Check the estimated time value and the workflow before deciding.

Your first 3 documents, free

Open the app. Create your project. Start with photos.

Your company, your whole team and five document types. Start with 3 free after verifying your phone and email.

Your 3 free documents are activated after you verify both your phone number and email in the app.

Preview: registration and download links are not connected yet.

Have a question? Contact us